
Temporary Use of a Vacant Lot
2023Two years of vacancy, two years of housing: a settlement of timber modules occupies a vacant lot until construction begins.

Silo Living
2022A silo at Alberner Hafen becomes a residential building. Flats interlock like Tetris pieces, shared spaces hold them together.

Stone House Restoration
2021A stone ruin in Croatia becomes a holiday home: the old walls outside, a new house of concrete inside.

Module Study
2019Living in steps of three by three metres: prefabricated modules that arrive by truck and combine into ever new flats.

ZOB Zürich
2018A cultural centre spreads over the bus station – anyone waiting for their departure stands right among theatre, studios and exhibitions.

Bus Stop
2017A single band of Corten steel connects Reichenau Island with its station – and along the way becomes footpath, roof, bicycle parking and bench.

Timber Pavilion
2017On Berlin's Drachenberg, a hill of post-war rubble, a public pavilion winds like a Möbius strip.